Location: Goodyear, AZ

​

Size: 900,000-sf

​

Project Type: Industrial Engineering

​

Website: https://www.nike.com

​

Accomplishments:

  • Studied production and people flow to create concept layout designs.

  • Full production simulation of material handling equipment and pedestrian traffic to optimize layout and mitigate MHE / human interaction.

  • Recommended automated material handling solution to support flow between storage and production cells.

  • Optimized warehouse sizing and design to support phased production build out.

  • Ten year phased build out plan of 900,000-sf manufacturing plant layout.

suburu, bic inc, industrial consulting, danvers massachusetts, boston industrial consulting, supply chain, facility transition

Related Case Studies

Screen Shot 2024-05-13 at 1.37.08 PM.png
4.png

Master Plan for a consolidation of 4 Manufacturing and Storage locations into a single facility, along with implementation of a new WMS system for parts tracking.

Screen Shot 2024-05-13 at 1.19.14 PM.png
IDEXX_Labs.svg.png

Design, specification and implementation of new VLM to Expand Cold Chain storage capacity within a -20 degree freezer while increasing overall picking throughput.

bottom of page